ED2 looks forward to serving your electrical
needs. The following information is provided to assist you in obtaining
electrical service to your new or altered service connection in a timely,
trouble free manner.
If you already have an existing electrical service
connection (meter base), go to Application for
Electric Service and follow the instructions.
If you are altering or installing a new electrical
service connection (meter base), please follow the instructions below:
Guidelines for Obtaining
New Electrical Service
1. Determine the size, type, and voltage of service
desired (200 amp, 400 amp, overhead or underground, single or three phase,
etc.). You may need to contact your builder or an electrician for this
information.
2. Print, complete and sign a Customer
Request for Service and an Application
for Electric Service. Mail, fax, or drop them off at ED2’s
office along with the appropriate deposit or letter of credit from a previous
electric utility.
3. Once the above forms have been received, ED2's
field representative will contact you to schedule a site visit prior to
preparing an estimate (Work Order Authorization).
4. District’s Line Extension Policy (General):
If the meter location is within
300 feet of an existing
primary pole, or padmount transformer, the
District will extend the line at no cost to the customer. A line extension
in excess of 300 feet normally requires an extension of the primary or
main line. If a line extension over 300 feet is required, the customer
will be obligated to pay a prorated portion of the total line extension
costs.
Example:
For a 1000 foot line extension, the
customer will pay a percentage of the Total Line Extension Costs over 300
feet:
Total Line Extension Costs X (1000-300)/(1000)
or 70% of the Total Line Extension Costs
The District reserves the right to determine
the voltage and phase of service as well as the service route and service
entrance location.
The customer shall provide all trenching
and backfill necessary to install underground wires on their property.
Service wires and connectors shall be supplied by the customer for commercial
or industrial installations.
If requested, the customer shall provide
to the District a legal description of the site, any surveying necessary
for the location of property corners, and any easements necessary to extend
the line.
For more specific information on line
extensions go to Line Extension Policy.
5. ED2 will notify you by phone or fax once an estimate
(Work Order Authorization) is completed. Please note that this is an estimated
amount only. Actual charges may vary depending upon the work site. You
will be credited or billed the difference between the estimate and the
actual costs.
6. Sign and return the Work Order Authorization,
if
necessary, and make arrangements to pay line extension costs.
7. Notify other appropriate utilities about the
project, i.e. Telephone, TV, Gas, Water.
8. You will need to obtain a permit for all new
or altered electric service connections from the appropriate inspection
agency. Within the city limits of Casa Grande contact the City of Casa
Grande Building Inspector (520)421-8600 or if you are in the County contact
the Pinal County Building Safety Inspector at (520)868-6455. Important:
ED2 cannot set a meter or connect your service until approval is received
from the appropriate inspection agency.
9. If you are performing any excavation, state
law requires that you contact Arizona Blue Stake at 1-800-STAKE-IT (1-800-782-5348)
a minimum of 48 hours before doing any digging. This is a free service.
If there are any privately owned water, irrigation or utility lines, you
will need to contact the private agency or person directly. Mark all proposed
excavation locations with whitepaint.
Utility locations are color coded as follows:
10. Call ED2 and confirm the meter base
and trench locations with the ED2 field representative and also confirm
with the ED2 Applications Desk that your account has been set up and arrangements
for a deposit have been made.
11. Install the meter base equipment (see Meter
Base Specifications) in the location and manner approved by ED2's
field representative. If you like, you can contact ED2
Contracting Services for a quotation to install the meter base equipment
for you.
12. Once installed, contact the appropriate inspection
agency and schedule an inspection of the meter base equipment.
13. If an underground service is being installed,
provide a minimum 30" deep, 8" wide, trench per ED2 requirements (see Meter
Base Specifications) in the alignment and location approved by ED2's
field representative. Contact ED2 a minimum of 48 hours before digging
the trench to schedule the installation of the service cable.
14. When the service has been inspected and approved
by the appropriate inspection agency and is installed in the location and
manner approved, ED2 will then connect the service and install a meter.
Once again, ED2 looks forward to serving your
electrical needs.
If you have any questions, feel free to call the
office at (520)723-7741 or Toll Free at (800)259-1306.